David, I have been preparing specs for 30 years, your dilemma is common, even on condo work I have yet to be dragged into a lawsuit, sure I’ve been named on lawsuits, attended my share of depositions, but never actually sued.
BTW, if any Contractors are reading this post, my apologies. please don’t be offended by my next remarks.
My firm’s difference compared to David Axt is that I prepare specs in the private sector, primarily in Florida, but what I’ve learned in my work is Architects seldom read the specifications, and FL Contractors read the specs so they can find mistakes in their favor which they will later use against the Architect. On many jobs, FL Contractors excel at making the specs disappear, offering Owners incentives to reduce construction cost. FL Contractors care little about the Owner or the Building Users, they only care about making a profit, any way they can, there is no such thing as cooperation between construction professionals in Florida.
I had a project 10 years ago that reinforces Mark’s wise advice, I had stopped working for a Condo Architect for reasons not to be discussed here, said Architect decided previous specs I had written for his firm were his and he could reuse them, which he did, but he made the mistake of having a non-specifier revise the specs, erasing key language, in one instance pretreatment of aluminum to receive AAMA 2605 paint, how the fabricator missed it is beyond me, but aluminum railings for five high rise condo projects were installed without pretreatment, and all 5 condos had railing paint failure. The Architect’s attorney notified me that I was at fault, absurd, as I was not contracted to prepare the specs nor was the Architect allowed to use my specs on another project, but what really saved me was the Architect used another type face to revise the spec and did it in a sloppy manner. I am pedantic in regards to my spec page format, I never leave blanks, when I delete text, only I can tell what has been deleted. In this case I was able to show the attorney before and after format, and previous work examples for the same Architect, he figured out what happened, apologized and than asked me if I would help the Architect correct the specs, I declined.
Funny how my disgust did not last, 3 years ago I prepared specs on a 52 story for the same architect, its under construction, the Developer’s VP for Construction had requested my involvement, I have to admit that request felt pretty good, it will be an awesome building.