Harold and John,
WDG Architecture, Washington, DC and Dallas, TX are locations of our offices. All specs written out of DC where I am Associate Principal Specifications and Research, 24 years with them all as head of their specifications.
Our practice is high rise residential (both condos and apartments), office buildings, corporate headquarters, hotels, interior design, and a few other sectors we touch on.
Office is about 40 in Dallas, 140 in DC, architecture and interiors in both.
The Dallas office has projects around Dallas, Austin, Houston and in Colorado. The DC office has projects up and down the east coast, and we have done some design only work in Egypt.
Our typical membrane is hot fluid applied, American Hydrotech, Henry, Barrett for both waterproofing and roofing…though for waterproofing I will also leave it as a contractor’s choice to do Graces reinforced Procor system horizontally and Procor vertically. Secondary membrane, when someone really feels they have to have a single ply membrane is Sarnafil’s PVC (variety of thicknesses are available), and one of their typical applications is use as a pool liner.
In Dallas, the local fire marshal thinks the IBC prohibits the use of kettles (one of a few places in the country that has this prohibition) so in that jurisdiction we go with the Sarnafil. It can go in as a protected membrane system for roofing just fine.
I would not hesitiate to use either system in a plaza configuration over occurpied space, you will be able to get 20 year plus warranty that is a good quality warranty from either, though frankly, I think Hydrotech has one of the best and easiest to understand warranties out there. They act as a single source warranty for the entire system from pavers, pedestals (if used), insulation (retention of insulation value over time) to the membrane itself and its flashings.
My first project I was responsible for before I came here was National Geographic Society M Stree Headquarters building (DC). The entire site at grond level is filled with landscape and drive areas and the building is set back. But below the ground it is 100% lot line built out with museum storeage, museum work areas and soundstage areas for filming. Its all hot fluid applied waterproofing. The facade is stepped back planters where the planters are 1/2 extending past the floor below, and 1/2 over the occupied space, done as a roofing system. The systems are 30 years old, and no repairs. They were considering replacing the main ballasated protected membrane roof with a reflective energy star roof (the buildng became the pilot project for LEED Existing Building and they wanted to continue in that line). I suggested that they contact the existing membrane manufacturer since they have a program of coming out, recertifying the membrane, inspecting and perhaps raising flashings and going over from stone to pavers with a reflect coating in them or even a vegetated system over the existing membrane. After 30 years, the membrane looks like its only just cured.
William