Hello fellow specifiers, sorry for the long question, but I would appreciate your input on a confusing topic for a Wisconsinite specifying seismic requirements.
Our firm has done a number of projects in Illinois and Virginia that required seismic requirements be included in the specifications. It has been a frustrating process since we have yet to find an AHJ that is conversant in the topic and the AIA/Avitru Masterspecs dont seem to have any clear and consistent language about seismic requirements.
(FYI we have often borne the brunt of contractors irritated that we specified seismic requirements, insisting to the Owner that no one does that and therefore the Architect has no idea of what they are doing and we are just doing unnecessary things that add cost to the project).
We feel that we have a fair understanding of most of the nonstructural requirements except those for glazing. My question is about interpreting ASCE 7-10, particularly 13.5.4 and 13.5.9. The code mentions glass in glazed curtain walls, glazed storefronts, and glazed partitions. It does not mention glass in doors, windows, borrowed lites, and similar smaller openings. If I interpret this literally, then the requirements only pertain to glass in glazed curtain walls, glazed storefronts, and glazed partitions and therefore it does not pertain to other glazing applications.
But I do see a flaw in my interpretation logic:
There is no mention of skylights, which would of course need to be carefully designed for glazing displacement.
There is no exception or definition in ASCE that supports my interpretation. In other words, there is no definition of a glazing size limit that the code does or does not apply to.
I asked a commercial curtain wall rep in Virginia and he put me in touch with one of their engineers. The engineer disagrees with my interpretation, insisting that it applied to ALL glazing (but he was not very strong or clear about his line of reasoning).
But, there is also no indication in ASCE that suggests that the requirements broadly apply to all glazing. Why do they mention glazed curtain walls, glazed storefronts, and glazed partitions if they meant it to apply to ALL glazing?
So, what is your interpretation?
And ultimately I am trying to determine whether these requirements should be specified in the Glazing spec, or within individual glazing framing sections. I lean toward the Glazing spec since that is where edge clearances and installation is controlled through delegated design. But Avitru Masterspecs are surprisingly vague and confusing about all of this. I would appreciate any opinion on this.