Hi everybody. I was hoping to get some guidance on how to easily/properly/correctly track steel recycled content on the projects I manage. I work for a small steel fabricator and erector and we run into LEED projects every so often and have trouble trying to gather the correct information easily and correctly and present it to the general contractor.
There are several questions I have and hope someone can help. First, we buy our steel through various distributors since we are small and do not have accounts directly with steel mills like larger fabricators do. As a result, we are sometimes able to get mill certs for steel pieces, but often our distributors do not have the certs available.
By not being able to buy directly from a mill, we may get steel for a particular project from a dozen different mills after all is said and done, and like I mentioned above, we get some mill certs, but certainly not all the certs for all the steel purchased for a project. In fact sometimes we use our stock steel for emergencies for use on a job and dont have the certs available for the stock material.
How do I correctly present the recycled content for the steel? For the steel we have mill certs for, I have recycled content letters from the corresponding mill. If for example you have $200,000 in steel material/fab costs on a project, when you turn in your LEED form to the general contractor, do you break out the costs per mill? Ive seen it where people will put $200,000 for material value and put a dozen mill recycled content letters stapled to the form and thats it.
I ask because I have no idea how to break it out by mill, if thats even needed. We may order (30) angles from a distributor and those angles could come from (5) different mills and be used on multiple projects. The angles are put in a stack in our shop and when a worker pulls an angle for a job, we have no idea which mill that piece came from, and theres even a possibility that a single stick of angle could be used on a couple projects. How can you track material costs in that situation, or do you even have to? Do you track how many hours a guy spent fabing a piece, the cost of the paint he used, how many welding rods? So confusing.
I was thinking of just using the RSIs recycled content letter with the assumption of using electric arc furnaces for structural shapes like W-beams, angles, channels, tube, pipe, etc. but I dont know if that would even fly with the LEED consultants on the projects.
Help!