Partial answers, regarding steel, and overall performance clauses:
STEEL
For steel there is a rule of thumb you can always claim 25% without documentation. Per MASTERSPEC editor’s notes for 051200:
Retain one of two paragraphs and subparagraphs below if recycled content is required for LEED-NC or LEED-CI Credits MR 4.1 and MR 4.2. USGBC allows a default value of 25 percent to be used for steel, without documentation; higher percentages can be claimed if they are supported by appropriate documentation. The Steel Recycling Institute indicates that hollow structural shapes, pipe, and steel plates are made by the basic oxygen furnace method, which typically has 23 percent postconsumer recycled content and 1.5 percent preconsumer recycled content, and rolled structural shapes are made by the electric arc furnace method, which typically has 57.5 percent postconsumer recycled content and 6.5 percent preconsumer recycled content.
A. Recycled Content of Steel Products: Provide products with an average recycled content of steel products so postconsumer recycled content plus one-half of preconsumer recycled content is not less than [25] [50] [60] percent.
B. Recycled Content of Steel Products: Provide products with an average recycled content of steel products so postconsumer recycled content plus one-half of preconsumer recycled content is not less than the following:
1. W-Shapes: [60] percent.
2. Channels, Angles[, M] [, S]-Shapes: [60] percent.
3. Plate and Bar: [25] percent.
4. Cold-Formed Hollow Structural Sections: [25] percent.
5. Steel Pipe: [25] percent.
6. : percent.
7. All Other Steel Materials: [25] percent.
OVERALL PERFORMANCE CLAUSES
The military/federal govt guide specs have recently been updated to reflect their incorporation of LEED (instead of SPiRiT). These guide specs are very performance/descriptive oriented and typically never mention products by name, so it is a good place to look for another way of doing this beyond MASTERSPEC. Go to WBDG, scroll down to 01 33 29 “LEED™ Documentation”, click the PDF, then look at 1.6.2 as an example. There are two overall options in this paragraph, noted by the outer square brackets . The first one puts it on the contractor to make sure the total adds up to the required amount for the LEED credit. This is most of the time in my opinion, for how are we ever to know during design phase what the total exact cost of all materials will be (especially on public projects), and then what exact percentage of that number will be recycled, and considering post/pre-consumer breakdown? The second bracket option would be applicable if we were nearly omniscient.
The final answer will only be known when receipts are all totalled up, which is why MR credits are all construction phase submittals except the storage and collection of recyclables.