Ron,
When I have faced this issue in the past, I create a responsibility matrix of rows and columns near the right margin of the TOC. Yes, I create a table. Reading left to right I have a column for the Owner, Contractor when known, my firm, S, P, HVAC, E, building enclosure consultant, landscape, civil, LEED, and sometimes the Owner’s interior designer.
Not all column names are required. MEP if one entity can be in one column.
I highlight the names of the sections by others in bold face RED color. NEAT eh.
Content of Division 01 is dependent on my firms A/O agreement for CA responsibilities such as submittal procedures, substitution procedures. I might also include quality requirements, product requirements, final cleaning, etc.
A continuing coordination/QA issue of saying it once in the most logical location is the MEP consultants that repeat, contradict, do not coordinate with the general requirements of DIVISION 01. They want to be master and commander of all things MEP. MEP has a hard time just using the same project name in the section headers, and correct issued for date in the footer. I usually get a mess in page formats. Widows, orphans, options in left in place, metric units for imperial projects, etc.
Samples available upon request to wayne.yancey@crtkl.com
That is all I have to say about that.
NEAT = No excuses after this
Wayne