Has anyone specified a salt wall before?
Here is the product that the interior designer wants to use.
Has anyone specified a salt wall before?
Here is the product that the interior designer wants to use.
A few months back I wrote a DD spec for Salt Chamber’s Himalayan Salt Panel Wall, based on some manufacturer literature the architect provided me. I tentatively added it to our office master 097513 Stone Wall Facing; the project is on hold so I have not able to research and develop it further.
More recently, another project and manufacturer, I saw a salt sauna provided as a premanufactured kit which is assembled on site; I had edited the first project’s 097513 anticipating fully site constructed but I do not know how Salt Chamber provides it.
It looks like it is backlit panel. Not sure if the backlighting is part of the assembly or not. I would guess that it is.
I would go with jr2’s suggestion of 097513 Stone Wall Facing and add an electrical requirement article that covers power and lighting, etc. This is what I do with lighted mirrors: Use 088300 - Mirrors and add an article for the electrical/lighting requirements.
The thread content here got cut off before any real detail, so I can’t tell what’s actually being asked about salt walls. If it’s a reference to salt storage or salt-glazed masonry, the specification points that usually matter are moisture protection, joint detailing, and material compatibility. Can you repost the relevant part of the exchange, or clarify which assembly type you mean? North Dakota’s freeze-thaw swings make that detailing especially worth pinning down, but I’d rather respond to the specifics than guess.
The cut-off post leaves a gap, so I read the earlier ones as pointing to the Himalayan backlit panel rather than salt storage or salt-glazed masonry. For that panel, jr2’s approach of staying in 097513 Stone Wall Facing and adding an electrical article is sensible, similar to lighted mirrors under 088300. The useful question is whether the manufacturer supplies the backlighting as part of the assembly or expects field wiring; that changes how the article is worded. Here in Maine, moisture and freeze-thaw detailing are worth flagging too, whatever the kit involves.