Many people incorrectly believe that the subject matter formerly in Division 2 of MasterFormat 1995 all moved to Division 33. This misunderstanding has its roots in the continued believe that “location of the Work” is a criterion for the classification numbering scheme of MasterFormat 2004 and beyond. The criterion of “location” was eliminated in the 2004 edition.
In MasterFormat 1995 and earlier, “location of work” was a classification criterion. So, mechanical and electrical services LOCATED inside the building were specified in Divisions 15 and 16. Services LOCATED outside the building were specified in Division 2. Some used the magically, imaginary line “5 feet outside the building.” MasterSpec always used the building line, where materials and installation requirements truly changed. This avoided specifying differing materials and installation requirements from the building to the “5-foot line,” and those within the building all in the Division 15 section. if those requirements extended to the “5-foot line.”. MasterSpec simply specified systems (i.e. domestic water piping) inside the building and systems outside the building in two separate sections—the demising point being the basement wall or floor or foundation wherever the entry occurred. In the MF95 scheme, these two sections were one in Divisions 2 and one in Division 15. When MasterFormat was updated and expanded in 2004, the “Location” criterion was deleted. MasterFormat was expanded to include a subgroup of divisions in the 30s for “Site and Infrastructure.” Within this subgroup was Division 33 - Utilities.
There are several schools of thought related to what goes in Division 33 and Division 22. Some believe that all services outside the building should go in Division 33, thereby retaining the old criterion. In the “Explanation” column of MasterFormat for Section 33 10 00 Water Utilities says “Includes: water distribution for domestic consumption, firefighting, and irrigation for a facility site and for multiple facilities.” For Section 33 11 00 Water Utility Distribution Piping, the Explanation says “Includes: water distribution piping for a facility site and for multiple facilities”. The “Explanation” for Section 22 11 00 Facility Water Distribution says: “Includes: piping, equipment, valves, and specialties associated with domestic water distribution within and under the building. May Include: water service from the structure to the utility water service line.” These explanations support both schools of thought for application of the numbers.
Another school of thought to determine what to specify in Division 22 rather than 33 is that “ownership” (public utilities versus private services) should be the guiding principle. This approach says that the work results that are part of the building project, whether inside or outside of the building are governed by building (in this case, plumbing) codes; while public utilities are not governed by plumbing codes. Public utilities usually have more robust material and installation requirements and so the work results (materials and installation requirements) are considerably different and require different permits and licenses. So, following this school of thought public utility services (piping and wired services) are specified in Division 33; and private services are specified in Division 22. The handoff point becoming the meter (if one exists) or the connection to the public utility, wherever that occurs. The handoff can occur in the street, on the site, or inside the building (wherever the meter is located). Usually everything on the house side of the meter is governed by building codes and is specified in Division 22 and everything on the street side of the meter is in Division 33 (or at the connection-tapping-of the public service). The major exception is storm water piping, which can often not be connected to public or private services.
The CSI MasterFormat allows both implementations.
ARCOM, in producing MasterSpec and implementing the principles of CSI MasterFormat, chose the latter implementation approach. However, we recognize that design professions often prefer to have inside and outside services in separate sections. So, MasterSpec has two sections for water distribution: Section 221113 Facility Water Distribution Piping (outside); and 221116 Domestic Water Piping (inside). Materials and installation requirements in this section are written to comply with the International Plumbing Code. The handoff between these two sections is the building exterior wall.
ARCOM advocates that services serving multiple sites and buildings, such as on a college campus or a hospital campus or a military installation would be specified in Division 33. From the connection to those services or at a meter, the content would be covered in Division 22. Public utilities, of course, would be specified in Division 33.
If you are obligated by your client to specify outside services in Division 33, use Section 221113 and change the number and title. However, one word of caution: you will also need to search the sections in your project specification to change cross references in several other sections that refer to Section 221113 and change the numbers and titles wherever they occur as well.
When ARCOM acquired Spectext we began to expand on infrastructure and have pretty much left the existing organization structure as it was. It was create by those who had a slightly different opinion on how to organize, but still complies with the principles of MasterFormat.
Tell the civil engineer I owe him a beer for sticking with MasterSpec ;0)