# what do you do w/ IAQ plans

**URL:** https://forum.4specs.com/t/what-do-you-do-w-iaq-plans/943
**Category:** Sustainable Design Topics
**Created:** [November 29, 2007, 10:22pm UTC](https://forum.4specs.com/t/what-do-you-do-w-iaq-plans/943 "2007-11-29T22:22:27Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![robin](https://avatars.discourse-cdn.com/v4/letter/r/e5b9ba/32.png) [@robin](https://forum.4specs.com/u/robin)
#### Post date: [November 29, 2007, 10:22pm UTC](https://forum.4specs.com/t/what-do-you-do-w-iaq-plans/943/1 "2007-11-29T22:22:27Z")

</div>

Do you issue these as part of the specifications or as a separate document? On this project, the Contractor has provided a very thorough plan and wants it included in the Contract Documents, but the Architect proposes it should be a separate document.

---

<div class="post-metadata">

### Author: ![peggy](https://avatars.discourse-cdn.com/v4/letter/p/c37758/32.png) [@peggy](https://forum.4specs.com/u/peggy)
#### Post date: [November 30, 2007, 5:49pm UTC](https://forum.4specs.com/t/what-do-you-do-w-iaq-plans/943/2 "2007-11-30T17:49:20Z")

</div>

The IAQ Management Plan is typically a requested environental information submittal. The Contractor is responsible for creating it and enforcing it. It would not be included in the Project Manual.
