# Tile installation failure

**URL:** <https://forum.4specs.com/t/tile-installation-failure/4004>\
**Category:** Specifications Discussions\
**Created:** [September 21, 2023, 4:34pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004 "2023-09-21T16:34:19Z")\
**Posts on this page:** 8\
**Page:** 1

<div class="post-metadata">

**Author:** ![David\_Axt](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/david_axt/32/24_2.png) [@David\_Axt](https://forum.4specs.com/u/David_Axt)\
**Post date:** [September 21, 2023, 4:34pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/1 "2023-09-21T16:34:19Z")

</div>

This is why it is so important to specify proper tile setting materials, installation methods and expansion joints.

[https://www.king5.com/article/news/local/bellevue/south-bellevue-station-needs-tile-repairs-due-to-faulty-installation-sound-transit-east-link-extension/281-092fcc64-c12f-4c41-afaa-c3e9557d1831](https://www.king5.com/article/news/local/bellevue/south-bellevue-station-needs-tile-repairs-due-to-faulty-installation-sound-transit-east-link-extension/281-092fcc64-c12f-4c41-afaa-c3e9557d1831)

That is going be a costly rushed repair because Sound Transit needs to get their light rail station open right away.

---

<div class="post-metadata">

**Author:** ![khercenberg](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/khercenberg/32/104_2.png) [@khercenberg](https://forum.4specs.com/u/khercenberg)\
**Post date:** [September 21, 2023, 4:50pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/2 "2023-09-21T16:50:18Z")

</div>

So other than using the wrong tile, setting material, installation methods, and expansion control, it was a complete success?

Sounds like this went sideways from the beginning.

---

<div class="post-metadata">

**Author:** ![David\_Axt](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/david_axt/32/24_2.png) [@David\_Axt](https://forum.4specs.com/u/David_Axt)\
**Post date:** [September 21, 2023, 5:12pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/3 "2023-09-21T17:12:44Z")

</div>

Two wrongs do not make a right, but four wrongs do!

---

<div class="post-metadata">

**Author:** ![David\_Axt](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/david_axt/32/24_2.png) [@David\_Axt](https://forum.4specs.com/u/David_Axt)\
**Post date:** [September 21, 2023, 5:53pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/4 "2023-09-21T17:53:04Z")

</div>

This is why the TCNA Tile Installation Handbook and a good building product representative is so important for the success of a project.

It is kind of ironic that last week, the local Laticrete representative (John Gallup) gave the Puget Sound Chapter a talk on proper setting methods for large format tile.

---

<div class="post-metadata">

**Author:** ![khercenberg](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/khercenberg/32/104_2.png) [@khercenberg](https://forum.4specs.com/u/khercenberg)\
**Post date:** [September 21, 2023, 6:38pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/5 "2023-09-21T18:38:41Z")

</div>

Two wrongs do not make a right, but three rights make a left.

---

<div class="post-metadata">

**Author:** ![Davemetzger](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/davemetzger/32/389_2.png) [@Davemetzger](https://forum.4specs.com/u/Davemetzger)\
**Post date:** [September 23, 2023, 1:20am UTC](https://forum.4specs.com/t/tile-installation-failure/4004/6 "2023-09-23T01:20:04Z")

</div>

So the dispute with the Joint Venture resulted from an expansion joint misadventure?

---

<div class="post-metadata">

**Author:** ![awhitacre](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/awhitacre/32/117_2.png) [@awhitacre](https://forum.4specs.com/u/awhitacre)\
**Post date:** [September 25, 2023, 5:17pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/7 "2023-09-25T17:17:05Z")

</div>

I worked for a firm that was involved in a suit regarding tile flooring failures; when the tiles were pulled up – instead of “100% coverage”, the tiles were averaging about 35% coverage. We paid for a certified installer to install per the specs (type of bed, thickness, coverage) and in place testing was unable to dislodge the tiles. I think getting the TCNA tile setting certifications for the installer is super-critical for larger tiles. For the super-large tiles, we get the additional certification.

---

<div class="post-metadata">

**Author:** ![brian\_e\_trimble\_cdt](https://yyz1.discourse-cdn.com/flex047/user_avatar/forum.4specs.com/brian_e_trimble_cdt/32/380_2.png) [@brian\_e\_trimble\_cdt](https://forum.4specs.com/u/brian_e_trimble_cdt)\
**Post date:** [October 11, 2023, 6:40pm UTC](https://forum.4specs.com/t/tile-installation-failure/4004/8 "2023-10-11T18:40:52Z")

</div>

Besides the TCNA handbook, there is now Advanced Certifications for Tile Installers (ACT) which qualifies the actual tile installer ([https://www.tilecertifications.com/](https://www.tilecertifications.com/)). This is a skills based test that shows a craftworker knows the materials and proper installation methods. While things could still go wrong, at least they have proper training. I assume the contractor on this project probably had none of that.
