Following that logic, we should reference in each section: several if not all Division 1 sections, every other section that might have anything to do with the section you’re in (some already do almost that under “related sections”), each drawing, maybe specific drawing details and paragraphs in specifications, the general conditions and supplementary conditions, the IBC, state building code and local amendments, OSHA requirements, ADA, state requirements for driver’s license and insurance, requirements for operating equipment…and looking at some public sector specs makes me wonder if someone really thinks that.
Adding references doesn’t make the basic premise of the owner-contractor agreement - that the contractor is responsible for everything - any more enforceable. It sure isn’t going to keep the contractor from ripping apart his bidding documents.
Despite what common practice is, you only encourage bad practice if you cater to it. The contractor first signs a bid form saying that the bidding documents have been read and understood; the contractor then agrees to perform according to the contract documents. It is the contractor’s responsibility to get the right information, i.e., all of it, to each sub and supplier. If that isn’t done - tough luck.
It’s bad enough when contractors tear up the project manual; design professionals become partners in crime when they sell individual drawing sheets or specs by the page. Many firms distribute full sets of bidding documents only, placing all responsibility on the shoulders of the contractors. The amazing thing is that we aren’t distributing bidding documents on CDs or on ftp sites. The cost would be a tiny fraction of hardcopy distribution, and it would eliminate the old argument, “I didn’t get that sheet/section.”
The MOP recommends inserting text in the supplementary conditions to avoid any disagreement about the relationship of Division 1 sections. We add one sentence to address the issue at hand: “Specification Sections of Division 1 - General Requirements govern the work of all Specifications. The Contractor shall ensure that subcontractors, sub-subcontractors, and suppliers are aware of and comply with the provisions of Division 1.” (or something to that effect; I don’t have the text handy)
If we claim to believe in and comply with certain standards and standard documents - CSI’s Manual of Practice, MasterFormat, SectionFormat, the AIA or EJCDC conditions of the contract - why do we so easily back off? If the words we write mean anything, why are we afraid to enforce them?
I know that’s easy to say, and I believe every specifier I know at least bends the rules at times. The bottom line is that we have to get a message across, and sometimes the best way is not exactly according to the book. And that is where professional judgment comes in.
We have to be careful though. If we ignore the very standards we espouse, why should we expect those who interpret what we write to do otherwise? How do you counter the contractor who says, “You referred to Section 01234 here, so I followed it, but you didn’t refer to it anywhere else, so I thought it didn’t apply.”
Or, “You emphasized this part of the section, but you didn’t emphasize that part, so I figured it wasn’t really necessary.” (If I recall correctly, I saw a summary of a court decision that agreed with a contractor who made that argument.)
If we really followed our own rules, wrote short sentences, said only what had to be said, and said it only in the right places, our specifications would be half or less as long as they are now. They would be clear and concise, and contractors and suppliers would be better able to read and understand them in the short time they have to prepare their bids.