Mrak,
For my part, structural engineers have always been the most responsive and flexible.
Indeed, we do require that our structural masters be edited for any project that we do rather than use the structural engineers sections. That has to do with the internal coordination and cross referencing we do. We also have a more developed finishes section, espcially related to slab finishes which the structual engineers typically defer totally to our preferences.
In addition, for all our projects we separate out into a separate section all “Owner’s Testing and Inspection” requirements. This is for 2 reasons. One, it makes it easy to distiguish what the contrctor is testing and paying for even if they must hire an independent service and that which the owner is paying for and having tested. Two, it makes it easy for the Owher to take those sections and know what his testing service is going to provide and base his fees on. I have yet to see a structural master that does this - and many of the project specifications that I have seen from others don’t do this either.
But, the primary point that we make to the engineer is that he feel totally comfortable with the sections. If he does not like a particular paragraph, he can edit it, or send us a copy of his own marked for inserts, and we will accomodate them. Actually, if we don’t use that to simply update our master, we put the different engineers paragraphs in as alternate choices during the editing process. Next time around, its there as a choice or simply incorporated.
From time to time we also encounter a totally new topic which we do not have covered in any master. In those cases, we ask for the consultant to provide us with their own master edited, and electronic copiy. This I reformat into our system - not just page layout, but location of information, cross references to other sections. If he permits, we make it part of our master. If he does not, then we retain it with a specific notation that this master will only be used with the specific structural engineer. To date, most don’t mind its being incorporated.
Our editing process starts with our sending out masters out to the structural engineer 3 weeks before we would like to see them, 4 weeks before we absolutely have to have them. This goes out at Permit time as a review draft - where eveyrone gets to see the state of the project manual. This is typically 4 to 8 weeks to the final issue. So, the engineer gets to see how his edits were implemented, and to make changes before the final.
As to your points you raise…
1 - I agree for the most part. There always seems to be great talk about this, and there are programs for it - but nothing at Institute level ever seems to be really done. All that is done is passive for the most part, not active. Chapters are encouraged to be active, but there is not much that most chapters can actually do, they don’t have the resources or the manpower. Having been on the national board of directors of another association several years ago, I watched as out of nowhere at the annual meeting the at that time CSI President and CSI Executive Director both made presentations about CSI. There was no real coordination, there was certainly no follow up. Both of them knew I was on that board and had not contacted me in advance. I made sure they were aware I was there and asked if there was anything I could do to assist. Nothing. Frankly, it was as ineffective as a product rep making an inperson cold call at my office where I have never heard of him or his product and typically don’t even use the system - just drop off literature and depart. I think that CSI does connect with some associations more efficiently and consistently, but I don’t think its often. Certainly chapters and members are not informed of how they could get out and assist.
2 - This is not likely to happen now, or in the future. There actually is considerable leeway in the page format (section format is more defined). Font, margins, headers, footers, spacing between paragraphs, use of bold (or not) and other styles, those are free for choice. We take great effort to give our clients (owner’s) a product that is visually easy to use ultimately for their facility management as well as for the contractor during construction. Our project manuals are actually a marketing tool.
3 - That’s always unfortunate - but its one thing I refuse to permit. When we have a consultant that has their own master that are being used (MEP), if someone wants to suddenly change the date in the last week of production I tell them that though I can make the change easily enough, they need to see the consultants - make sure they can do it, and will it be a cost. But in many offices the production of the project manual does not have that kind of input or control.
4 - This seems to be the most common error of architectural firms. Actually, for some of the Division 1 and the conditions are the last thing they actually do. I think its about the dumbest thing. Now, if you have consultants that are familiar with you, that’s something else. But even then I think every consultant deserves to see this for every project no matter how typical. There are always elements that are different from project to project.
Maybe we should work together some time -grin!
William